Description

This rock-solid workbench incorporates two vises, a laminated top and options for a hanging tool tray or under-bench cabinet.

Project measures 72? long by 36? deep by 35? high.

This plan was proven in the WOOD magazine shop by its editors and master craftsmen.

This is a downloadable plan.Instructions given to download after checkout.

MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY